kicker L5 10'' sub in stock location...
13 Attachment(s)
given a problem/solution basis, we wanted to keep as much cargo room as possible, and still have a good amount of bass. with our solution we will achieve this and only loose 4.5'' of usable cargo space. follow along and i will describe all materials as we go...
Attachment 35612 Attachment 35613 panel was removed, covered in sound absorbing material, crackes were sprayed w/ foam, covered in fiberglass matting and sealed to make sure we have an air tight enclosure Attachment 35614 Attachment 35615 next we made a cardboard template to that we will transfer onto .75'' mdf Attachment 35616 Attachment 35617 Attachment 35618 Attachment 35619 Attachment 35620 next you will cut out a speaker ring, this will be spaced out 2'' and brad nailed to the template Attachment 35621 next we cut out the rest of the mdf so we will not limit valuable air space, but still have enough to mount our enclosure Attachment 35622 Attachment 35623 Attachment 35624 next use a piece of fleece or carpet that will strech around your project. i use spray glue to hold it tight, while i staple it all around the edges, notice how tight the fabric is, that will give you the neat shapes |
part 2- of the kicker L5 sub in stock location
12 Attachment(s)
Attachment 35600
Attachment 35601 this first pic is of the material all bunched up, notice though that the sides are smooth, the second pic is all the material trimmed ready for resin Attachment 35602 Attachment 35603 this is the project from the front covered in two nice coats of fiberglass resin, Attachment 35604 this is the back, we filled the two holes in the side w/ material and resin to strengthen it Attachment 35605 Attachment 35606 with the material so hard now, we will use a router to cut out the opening for the speaker Attachment 35607 one final coat of resin and its ready for body work... Attachment 35608 Attachment 35609 we hit it with a grinder. that will give the body filler something to stick to, at this time we also make sure the back surface is completely level Attachment 35610 Attachment 35611 firs layer of body filler goes on, it is ready to hit w/ the cheese grater after about 10 minutes of set up time |
part 3- of the kicker L5 sub in stock location
6 Attachment(s)
Attachment 35594
Attachment 35595 Attachment 35596 Attachment 35597 this is hit with the cheese grater and then with 36 grit sand paper, it is starting to take shape now, we will give it one more coat of body filler and then smooth it out with 80 grit sandpaper Attachment 35598 Attachment 35599 as it was getting dark we finished all the major body work. we put 3 good coats of slick sand (high build primer) and will let that dry for several hours, we will post all the finishing touches and install in the next tutorial. stay tuned!!! |
lookin sweet man. keep us updated
|
All times are GMT -5. The time now is 12:07 AM. |
© 2024 MH Sub I, LLC dba Internet Brands