Finally making progress... Bathroom Remodel
After weeks of working on this off and on.. We finally are seeing the light at the end of the tunnel..
Whats finished now...
-Walls/Trim/Ceiling Painted
-Crown Mold Installed
-Upper n Lower cabinets installed/painted
-Counter Top Cut for sink
-Tiled the shower, floor, back splash
Whats coming this week...
-Tile Grout
-Sink/Toilet Install
-Sink/Shower Hardware install
-Cabinet Doors install
-Shower Door install
-TP holder, Towel Rack, ect..
PICTURES ..





Hope you like the progress . We are excited to get it all done.
Whats finished now...
-Walls/Trim/Ceiling Painted
-Crown Mold Installed
-Upper n Lower cabinets installed/painted
-Counter Top Cut for sink
-Tiled the shower, floor, back splash
Whats coming this week...
-Tile Grout
-Sink/Toilet Install
-Sink/Shower Hardware install
-Cabinet Doors install
-Shower Door install
-TP holder, Towel Rack, ect..
PICTURES ..




Hope you like the progress . We are excited to get it all done.
Very nice. I love it when folks do their own work. Personal satisfaction on a job well done and saving $$ for important things like hot rod parts. (Yes, I now realize you are a pro).
Last edited by c2vette; Jan 20, 2009 at 10:23 PM.
thanks guys.. the bathroom should be complete this week. its tough working on your own house when you work on remodeling home's 5 days a week.. not as fun, but deffintly rewarding once it's done.
-ill make a new thread when its done. showing the Before/After effect-
-ill make a new thread when its done. showing the Before/After effect-
Nice work! I have half a floor that's unfinished in my house (been like that for 12 years), with a rough-in for a bathroom, which I think I'll finish out this summer. Do you do anything special to seal the tiling around the shower? Or is it just the blue sheetrock, and rely on the grouting to keep moisture from wicking through?



ill be able to take showers n a big nice shower.. over that stinky little 50 yr old bathtub that was there