My Summer Project Finally Complete
My Summer Project Finally Complete
Well, 99.9% anyway. There are a couple minor touch-ups. This is our newly renovated "old" AKA "boys" bathroom. Back in May this started as a "honey, the bathroom drain is clogged..."
I don't have 'before' pictures but there was wood paneling on the walls, oak parquet flooring, rotted wood everywhere accelerated in recent years by boys peeing everywhere but in the toilet.
An hour or two in the evenings, a couple vacation days, 872 trips to Home Depot and this is how it came out. I wanted something different.
I don't have 'before' pictures but there was wood paneling on the walls, oak parquet flooring, rotted wood everywhere accelerated in recent years by boys peeing everywhere but in the toilet.
An hour or two in the evenings, a couple vacation days, 872 trips to Home Depot and this is how it came out. I wanted something different.


