The Lounge Off Topic PG-13.
Warning: The Lounge may contain irrelevant and off topic discussions that may not be related to anything HHR. If you are not interested in these kinds of discussions, do not read or respond to these threads.

GM to Reopen Spring Hill Manufacturing Plant

Thread Tools
 
Search this Thread
 
Old Dec 15, 2011 | 01:10 AM
  #1  
ThatChevy's Avatar
Thread Starter
Senior Member
 
Joined: 07-31-2011
Posts: 1,275
From: Clarksville, Tennessee
GM to Reopen Spring Hill Manufacturing Plant

As the title says GM is set to reopen its Spring Hill Manufacturing Plant in Spring Hill, Tennessee. The plant which opened in 1990 was the site for the now defunct Saturn brand building cars like the S-Series, Ion, and Vue until 2007. Then the plant was retooled and started producing the Chevrolet Traverse in 2009. Spring Hill continued to produce the Traverse until November 2009. Production was then shifted to Lansing, Michigan and the plant has been idle ever since. GM has now announced that it plans to reopen the plant by the second half of 2012 bringing back 700 jobs. They said they would spend $61 million dollars getting the plant ready to build the Chevrolet Equinox alongside the Ingersoll and Oshawa, Ontario plants due to high demand. GM then said it would later invest $183 million dollars and add 1,200 more jobs to build a new midsize vehicle there for the 2015 model year. A link to the full story is posted below.

http://www.nytimes.com/2011/11/22/bu...-700-jobs.html
Old Dec 15, 2011 | 07:14 AM
  #2  
SmootHHR's Avatar
Senior Member
 
Joined: 01-21-2010
Posts: 1,700
From: The Middie OHIO
Good to hear that they are going to utilize that facility. I've heard that it may be used as a "quick change" facility to pick up slack when other plants are behind. Neat concept, if they pull it off.
Old Dec 15, 2011 | 12:33 PM
  #3  
Snoopy's Avatar
Platinum Member
 
Joined: 05-09-2006
Posts: 6,805
From: "Upland" Mesa, Arizona
Trivia......

I was one of several who had responsibility to build that plant. I think we did a good job.
Old Dec 15, 2011 | 01:46 PM
  #4  
sleeper's Avatar
Platinum Member
 
Joined: 01-09-2007
Posts: 16,081
From: SE USA
That's where my '08 2.4 engine was built..
Old Dec 15, 2011 | 02:17 PM
  #5  
07azhhr's Avatar
Senior Member
 
Joined: 10-06-2011
Posts: 1,150
From: Mesa, AZ
700 jobs soon and another 1200 more in the future sounds good. I hope this is the start of a new trend.....insourcing.
Old Dec 15, 2011 | 02:38 PM
  #6  
sleeper's Avatar
Platinum Member
 
Joined: 01-09-2007
Posts: 16,081
From: SE USA
I hope this is the start of a new trend....."insourcing".

Yes that used to be the norm.. Be nice if we could ever get back to it..
Old Dec 15, 2011 | 03:30 PM
  #7  
Blue_SS's Avatar
Senior Member
 
Joined: 06-07-2011
Posts: 2,180
From: SE Mich
GM has been bringing a lot back inside. Some plants are running out of floorspace as a result. I don't know if it's a trend, but unlike 10 years ago, at least some things are coming back inside. It gives more control over the parts, delivery, sequencing, etc.

Spring Hill should have never been converted to the Traverse build in the first place. They could have been building Vues down there with Equinoxes years ago.
Old Dec 15, 2011 | 03:53 PM
  #8  
djr1973's Avatar
Senior Member
 
Joined: 05-11-2009
Posts: 2,116
From: Weston, Ohio
I rebuilt a coolant filtration machine for this GM plant this past summer at work. We actually have done a total 5 rebuilds for GM, each machine went to different facilities. The machines that we rebuilt for them were machines from plants that they have closed, so new things were added to the machines to "re-tool" for their future homes.
Old Dec 15, 2011 | 05:09 PM
  #9  
TurboTechRacing's Avatar
Former Sponsor
 
Joined: 10-08-2007
Posts: 1,821
From: Minnesota
Originally Posted by sleeper
I hope this is the start of a new trend....."insourcing".

Yes that used to be the norm.. Be nice if we could ever get back to it..
Yes agreed!
Old Jan 2, 2012 | 11:20 AM
  #10  
Oldblue's Avatar
Administrator
 
Joined: 10-13-2011
Posts: 39,970
From: Welland,Ont Canada
it would be awesome if the Big 3,(Bowtie, BlueOval and Penastar, remember those days??) would learn that new mantra for the future INSOURCING , lets build back a strong economy one job at a time!! one new ride at a tiime!!!



All times are GMT -5. The time now is 04:22 AM.