Toms 26 T project
Thread Starter
Senior Member
Joined: 01-13-2006
Posts: 3,000
From: Superior, WI - Over the Hill Warranty Club member
Todays progress.
Headers have high temp paint now. The extensions also but are left off for interior access.

Interior work is down to the seat cushions and floor covering.
Headers have high temp paint now. The extensions also but are left off for interior access.

Interior work is down to the seat cushions and floor covering.
Thread Starter
Senior Member
Joined: 01-13-2006
Posts: 3,000
From: Superior, WI - Over the Hill Warranty Club member
Call the seats - Dun, picked up the floor covering tonight.


The engine unveiled.

Hmm, light at the end of the tunnel I see.

Thanks to the snow storm on the way, I hope to get it out Sunday or Monday for some good pictures.


The engine unveiled.

Hmm, light at the end of the tunnel I see.

Thanks to the snow storm on the way, I hope to get it out Sunday or Monday for some good pictures.




